  • All of our lumber is machine stress rated, and we also can fabricate with LVL materials.
  • Depending on the size of job, anywhere from 1-4 weeks, typically, from the approval.
  • With a floor truss plumbing, HVAC and electrical can be installed up in the floor level. This can gain approximately 12" extra ceiling height in rooms below.
  • We have shipped an 84' Pole Barn before. This is dependent upon other design criteria, but usually we can accommodate long spans.
  • Call your truss designer before you cut anything. Some trusses can be trimmed while others absolutely cannot.
  • If using our new product SCS TrueTrims, the ends can be cut up to 12".